|
|
PROJECT "SLOKANA Type A"
This feature home was designed
for a client in Slovenia that wanted European style and design, with
beautiful log accents. The construction is post and beam with the shell
made of Canadian western red cedar.
|
|
|
The preliminary design process
takes 2-3 weeks. Home construction 6-8 weeks, and delivery 4-6 weeks.
We work within our customers
planned budget and help you achieve your wants and needs.
|
|
|
As part of the design process, you will be provided with a 3D
movie and animation of your dream home. You will be able to visit
your home inside and out, before it is actually built on your
building site.
|
|
|
PROJECT "VOJNIK RANCH"
We designed this custom log home for a
customer near Celje, Slovenia. It features large windows to capture not
only the sun, but also a panoramic view of the beautiful valley below. |
|
|
Time to build this type of western red cedar log shell is between 12-16
weeks, with another 4 -6 weeks for shipping to the port of Koper in
Slovenia. |
|
|
|
|
|
This home was customized for our client from the
Malone plan residing in our plan section. It features a wonderful livable
room outlay within a simple
rectangular format which is transformed by the angles of its prow. |
|
|
|
|
|